Skip to content
World Wide Professional Solutions

Senior Project Manager, Utility Electrical, Vernon, TX – Data Center Construction

Vernon, TXOnsite · United States
Manager · Full-Time · Project Management
POSTED 30 SEPT
Apply Ask
Pay · market
$85k–$170k
p25–p75 · n=7510
Open for
37d
since 30 Sept
H-1B · FY26
2
certified LCAs
Hiring · 30d
41
0 net · open roles

WORLD WIDE PROFESSIONAL SOLUTIONS is a project solutions organization committed to implementing lean constructions, collaborative contracting, and execution approaches to enable breakthroughs in performance.

WORLD WIDE PROFESSIONAL SOLUTIONS is a project solutions organization committed to implementing lean construction, collaborative contracting, and execution approaches to enable breakthroughs in performance.

WWPS is hiring a Senior Project Manager, Utility Electrical, to lead the utility electrical and high voltage substation scope for a large-scale data center project in Vernon, TX. This is a full time, 100% onsite role.

This is a high visibility owner’s representative role focused on the Futility electrical package, including the high voltage utility interconnection, substation, protection and controls, energization, and interface to the data center electrical distribution system. You will own execution across design, construction, commissioning, and turnover.

Wherever you are based, we provide full relocation or travel support including per diem, ensuring a smooth transition so you can hit the ground running from day one.

What Makes This Role Different

Owner’s representative leadership for the utility electrical and high voltage substation package

Direct coordination across the serving utility, substation contractors, engineering teams, vendors, commissioning teams, and data center stakeholders

Technical scope covering utility interconnection, transformers, breakers, switchyard equipment, protection and controls, metering, SCADA, grounding, and incoming power distribution

Ownership of energization readiness, switching coordination, testing, commissioning, and turnover of mission critical power infrastructure

A specialized role for a project leader who understands utility and substation construction, not only building level MEP electrical work

What You Will Do

Lead full lifecycle delivery of the utility electrical scope from design coordination and procurement through construction, energization, commissioning, and turnover

Serve as the primary owner’s representative interface with the serving utility, electrical EPC or contractor, design engineers, equipment vendors, commissioning teams, and site leadership

Manage high voltage substation and switchyard scope including transformers, breakers, disconnect switches, bus, instrument transformers, control buildings, station service, grounding systems, cable systems, and associated civil interfaces

Drive utility interconnection milestones, design approvals, long lead equipment procurement, outage and switching coordination, and required energization dates

Review and challenge electrical single line diagrams, substation layouts, equipment submittals, protection and control schemes, relay coordination, grounding studies, and construction packages

Oversee protection and controls, relaying, SCADA, telecom, revenue or utility metering, and the interfaces between utility systems and the data center electrical distribution network

Coordinate installation and testing of high voltage and medium voltage cables, terminations, transformers, switchgear, breakers, grounding, and related electrical infrastructure

Lead quality and commissioning readiness including factory acceptance testing, field acceptance testing, relay testing, electrical testing, punch resolution, and energization documentation

Develop and manage safe energization, switching, lockout tagout, outage, and turnover plans in alignment with utility requirements, NEC, NESC, NFPA 70E, OSHA, and project standards

Control schedule, cost, risk, change management, contractor performance, and interface issues for the utility electrical workstream

Identify constructability, sequencing, access, equipment delivery, and cross discipline interface risks early and drive them to resolution

What You Bring

12 to 20+ years of construction project management experience with significant electrical infrastructure responsibility

Strong experience delivering utility substations, high voltage electrical infrastructure, utility interconnections, transmission or distribution projects, or comparable mission critical power systems

This is a full-time position for World Wide Professional Solutions. We offer excellent benefits including medical, dental, vision, life, short term disability, long term disability, and a company match retirement plan. All benefits begin the first of the month following your start date.

World Wide Professional Solutions provides equal employment opportunities to all employees and applicants for employment and prohibits discrimination and harassment of any type without regard to race, color, religion, age, sex, national origin, disability status, genetics, protected veteran status, sexual orientation, gender identity or expression, or any other characteristic protected by federal, state or local laws.

Source · World Wide Professional SolutionsFirst seen 2 NovOriginal ↗