Skip to content
Anthropic

Data Center Power Generation and Microgrids Engineer

Remote-Friendly, United States; Remote-Friendly US (Travel Required)Remote · United States
Compute
POSTED 30 OCTVERIFIED 3H AGO
Apply Ask
Role
20 days opentrue age
Closes in ~49d at the median (69d)
Posted 30 Oct · n=161
Payats field
$320k–405kposted
▲ +134% vs market median $155k
$120k$405k
Market p25–p75
$120k–$200k
Anthropic p25–p75
$299k–$381kn=43
H-1B median · Software engineering
$190k
United States · n=8016 · 365d to 19 Nov
CompanyAnthropic →
637open roles
Opened · 30d
+113
Closed · 30d
−164
Signal
● Steady−51 net
19d of snapshots · 30d window
Market
37,652open · Software engineering
Opened · 7d
+3,66110% of open
All software engineering
75,120open
All tracked boards · live 20 Nov · n=37,652
Visa
191H-1B LCAs · FY26
Median wage
$190k
UK licensed sponsor
✓Worker (A rating)
LCAs FY26 · n=191 · to 2026-06-22

About Anthropic

Anthropic’s mission is to create reliable, interpretable, and steerable AI systems. We want AI to be safe and beneficial for our users and for society as a whole. Our team is a quickly growing group of committed researchers, engineers, policy experts, and business leaders working together to build beneficial AI systems.

About the role

Training and serving frontier AI models requires compute infrastructure at a scale and density that pushes past what conventional data center designs were built to handle. The loads involved are large enough — and arrive fast enough — that utility supply alone often can't meet the need on the timeline required, and the step-load behavior of large accelerator clusters creates power-quality and ride-through demands that conventional backup-generation designs weren't built for. Anthropic's Data Center Infrastructure team is responsible for solving that problem: delivering facilities that can be energized early, ride through grid disturbances, and present a well-behaved load at the point of interconnection (POI).

As a Data Center Power Generation & Microgrids Engineer, you'll own the behind-the-meter generation and storage architecture for Anthropic's data center portfolio. That means the on-site generation fleet — reciprocating engine gensets, gas turbines, fuel cells — and the battery energy storage systems that buffer load steps and provide ride-through. It means the microgrid layer that ties them together: islanding and resynchronization, black-start, load-shedding, and generation dispatch. And it means the grid side: interconnection studies and agreements, IEEE 1547/2800 compliance, and power quality at the point of interconnection. You'll also own our temporary- and bridging-generation strategies — the plans that let a site energize and start serving load before permanent utility service is available, and transition cleanly once it is.

This is a deeply cross-functional role. You'll work closely with colleagues across the infrastructure team on where and how generation and storage tie into the site electrical distribution, controls, and SCADA, and with our hardware and compute teams to understand the load characteristics you're designing against. You'll be Anthropic's technical counterpart to on-site generation providers, BESS integrators, utilities, and ISOs/RTOs. Expect roughly 20–35% travel for design reviews, factory witness testing, and site startup.

Responsibilities

On-site generation engineering

Own Anthropic's behind-the-meter generation architecture across the portfolio — prime-mover selection and sizing (reciprocating engines, gas turbines, fuel cells), paralleling topology, redundancy, fuel systems, and emissions controls — and maintain the generation basis of design and technical specifications that build partners and generation providers design against

Set the day-one vs. day-N plant sizing and expansion strategy — what the plant needs on day one so it can be expanded or augmented later, and how to add units, storage, or a grid tie to a system already running

Characterize the data center load for external generation partners — step changes, ramps, oscillation, fault behavior, and non-IT load — so providers can size and tune their plant against the real duty

Model generation response against the load profile of large-scale ML training — step-load acceptance, block loading, transient frequency and voltage response, load rejection — and set the acceptance criteria (e.g., per ISO 8528-5) that generation packages are tested against

Develop temporary- and bridging-generation strategies that deliver early site energization ahead of permanent utility service, including the sequencing, protection, and controls changes needed to transition from temporary to permanent power without stranding equipment or capacity

Ensure generation designs meet NFPA 37, NFPA 110 where the plant provides emergency or legally required standby power, fuel-gas and fuel-storage codes (e.g., NFPA 54, NFPA 30), and applicable emissions requirements, and coordinate with environmental and permitting counterparts on the technical inputs to air permits

Source · AnthropicFirst seen 3 NovOriginal ↗