Skip to content
Saronic

Manufacturing Engineer - Test Planner

Brownsville, TX; Austin, TXOnsite · United States
FullTime · Port Alpha
POSTED 14 OCTVERIFIED 4H AGO
Apply Ask
Role
40 days opentrue age
Closes in ~37d at the median (77d)
Posted 14 Oct · n=33
Pay
$136k–$225kno pay posted
Market p25–p75
$136k–$225k
Austin · n=161 · 365d to 19 Nov
CompanySaronic →
301open roles
Opened · 30d
+43
Closed · 30d
−15
Signal
▲ Expanding+28 net
23d of snapshots · 30d window
Market
37,590open · Software engineering
Opened · 7d
+2,4146% of open
All software engineering
75,019open
All tracked boards · live 24 Nov · n=37,590

Saronic Technologies is a leader in revolutionizing autonomy at sea, dedicated to developing state-of-the-art solutions that enhance maritime operations through autonomous and intelligent platforms.

Job Overview

The Test Planner defines and sequences all forms of testing required to bring a vessel from fabrication through commissioning and delivery, covering structural/tank testing, piping system testing, electrical testing, machinery and propulsion trials, and vessel-level dock and sea trials. This role establishes the master test plan that ties every discipline's test requirements into a single, logical sequence tied to the build schedule.

Shipbuilding test programs span dozens of interdependent test types across structural, piping, electrical, HVAC, machinery, and outfitting systems, each with its own prerequisites, acceptance criteria, and regulatory requirements. The Test Planner ensures these tests happen in the right order, at the right stage of construction, without forcing rework or blocking downstream trades, and draws on experience from other shipyard programs to anticipate sequencing issues before they surface.

This role works closely with design engineering, production engineering, quality assurance, classification society surveyors, and the Master Planner to build a test program the yard can execute reliably across multiple ship programs.

Responsibilities

Test Program Development

Establish the master test plan defining every test required from first fabrication through sea trials and delivery.

Define test sequence, prerequisites, and dependencies across structural, piping, electrical, HVAC, machinery, and outfitting disciplines.

Translate classification society and regulatory test requirements (ABS, USCG, NAVSEA) into an executable test schedule.

Discipline Test Planning

Define tank and compartment testing requirements (hydrostatic, hydropneumatic, air/hose testing) and their sequence relative to structural closure and coatings.

Define piping system test requirements (hydrostatic, pneumatic, flushing) and electrical test requirements (continuity, megger, hi-pot, functional checks) at the correct build stage.

Define machinery and propulsion test requirements, including dock trials, harbor trials, and sea trials, in coordination with propulsion and machinery installation planning.

Schedule Integration

Integrate the test plan with the integrated master schedule, working with the Master Planner to protect test windows and sequence dependencies.

Identify where test requirements constrain or are constrained by construction sequence, coatings, or outfitting completion.

Flag schedule risk associated with test readiness and escalate conflicts before they affect milestone dates.

Cross-Program Knowledge Application

Apply lessons learned and test sequencing practices from other shipyard programs to anticipate issues before they occur at Saronic.

Identify where test program structure used on prior programs can be adapted to Saronic's vessel designs and build strategy.

Benchmark test program efficiency and rigor against practices observed at other shipyards.

Execution Support & Continuous Improvement

Support test execution, working with production, quality, and classification surveyors to resolve test failures and retest requirements.

Maintain test documentation, acceptance records, and the traceability required for classification and regulatory review.

Refine the test plan and sequencing standards based on execution results and lessons learned across programs.

What Success Looks Like

Tests happen in the correct sequence, without rework caused by testing too early or too late in the build.

Test failures are rare, and when they occur, root cause and retest paths are clearly defined.

The test schedule integrates cleanly with the master schedule without becoming a hidden source of schedule risk.

Classification society and regulatory test requirements are met without last-minute scrambles.

Production, quality, and program leadership trust the test plan as an accurate, executable reference across every ship program.

Source · SaronicFirst seen 2 NovOriginal ↗